Google Translate

Worldwide | United States/Canada

Sports Complexes

National Olympic Sports Center
National Olympic Sports Center has an area of 660,000m2, including large and medium sized gymnasia like ground track field, swimming pool, multifunctional gymnasium, hockey field, tennis court and softball ground, as well as the supporting facilities like 2 indoor practicing gymnasia, track and field practicing ground, football practicing ground, throwing ground, checking and recording site. National Olympic Sports Center is the major training site of the National Athletics Center and National Team. Handball Final of Beijing 2008 Olympic Games will be held in the Multifunctional Gymnasium of National Olympic Sports Center.

Capital Stadium
Capital Stadium covers an area of 40,000m2. There are 18,000 seats in the game hall. The hall is equipped with the equipment like the broadcasting device, television relaying, facsimile, time keeping and scoring, etc.; the game fields are consisted of 21 electric control movable floors suitable for a number of games, such as skating, table tennis, badminton, basketball, volleyball, handball, gymnastics, tennis, etc. The volleyball final, volleyball and basketball preliminary contests in Beijing 2008 Olympic Games will be held at the Capital Stadium.

Typical products and applications: The information socket is installed in the pressroom, TV and broadcast relaying room, news release hall, official office, site mobile press box, lighting control and broadcasting room, TV and broadcasting commentator box, incident checking room, site judge box, etc. to meet the demand of specific work flow and the requirement of the system equipment installation. Corresponding information socket specifically designed is installed at the organizing committee office, Chinese pressman rest room, referee rest room, coffee house, press box, VIP entrance and athlete entrance for installing the IC telephone, magnetic card telephone and touch screen, which reflects the spirit of humanized science and technology. With the features of nice-looking, easy to mark, free of installation tool free, 45°level and with dustproof cover, Siemeon MAX information socket is used ensuring the overall high transmission performance of the cabling system.